







A free site visit, a check of what your lot allows and a written, line-item price.
Get your free estimateTrusted ADU Builders for Bellevue Homeowners
The hardest part of an ADU project in Bellevue usually isn’t the building. It’s the paperwork, the design decisions, and finding one team willing to own the whole thing from the first sketch to the final inspection. That’s the gap we close. We build one thing and one thing only: accessory dwelling units, including detached ADUs, garage conversions, junior ADUs, and home additions. Our technicians have up to 14 years of experience, and every project runs on a written, line-item estimate so you know what you’re approving before anything starts. Permits are confirmed with the city’s planning and building department before plans are final. Call (425) 699-8731 to schedule a free estimate. We answer 24/7, and fast dispatch runs from 7am to 7pm, Sunday through Friday.
What Our ADU Builders Service Includes
Every project we take on starts with a real conversation about your lot, your budget, and what you want the unit to do for you. From there, the work splits into a few clear paths. Here’s how each one fits.
Detached ADU
A detached ADU is a standalone structure on your property, separate from the main house, with its own entrance and utilities. It’s the right choice when you want rental income, a private space for family, or a long-term value boost without touching the layout of your home. We handle the full build: site assessment, design, permit work, site prep, and construction. A typical new detached ADU in Bellevue runs an estimated $180,000 – $350,000 depending on size, finishes, and how much site work your lot needs.

Custom Built ADU
A custom-built ADU is designed around your lot and your needs rather than a preset floor plan. You get choices about layout, materials, roofline, and how the unit sits against the main house. We take it from concept through design, permits, and construction, and we keep the plan aligned with what the city will actually approve. Custom is the right path when the prefab options don’t fit the shape of your lot or the way you want the space to work.

Prefab ADU Installation
A prefab ADU is a factory-built unit delivered to your site and installed by a team that knows the product. It can shorten the on-site build and give you a proven floor plan with predictable materials. We work with leading prefab brands including Abodu and Cover, and we handle the site prep, foundation, utility connections, and permit work that surround the install. Prefab isn’t right for every lot, and we’ll tell you plainly when it isn’t.

Modular ADU
A modular ADU is built in sections off-site and assembled on your property, sitting between fully prefab and fully site-built on the spectrum. It’s a good fit when you want more design control than a standard prefab offers but still want much of the construction done in a controlled setting. We coordinate the modules, the site work, and the inspections so the pieces come together on one schedule instead of several.
Studio ADU
A studio ADU is a compact single-room unit with a kitchenette and bathroom, built either detached or as part of a conversion. It suits rental income, a home office with its own entrance, or guest space, and it often fits lots that are too tight for a larger unit. We design it to the lot, confirm the size and siting rules with the city, and build it to the same standard as a full-size unit.
Junior ADU
A junior ADU (JADU) is a smaller unit built within or attached to the existing house, typically converted from an existing room or garage space. It’s the most cost-efficient path to a legal second living space, with an estimated range of $40,000 – $90,000 depending on how much interior work the space needs. We handle the design, the permit work, and the construction, and we confirm the specific JADU rules with the city before plans are final.
Brands We Work With for ADU Builders
We’re familiar with the prefab ADU brands that homeowners ask about most. With Abodu, we know how the units are built, what site conditions they need, and where the coordination between the factory and the site tends to get tight, so the install moves without surprises. With Cover, we understand the design flexibility the product offers and how to match it to a Bellevue lot that may not be a simple rectangle.
We also work with Dvele for homeowners who want a higher-performance prefab path, and we’re comfortable coordinating the site work, utilities, and permits that surround those units. We are not a dealer and we don’t claim exclusivity with any of them. Whether you have your eye on a specific prefab product or you want a fully custom build, we can help you compare the options honestly before you commit.
Signs You Need ADU Builders Right Now
Most people wait too long to bring in an ADU specialist, and the delay costs them in redesigns and rejected plans. If any of these sound familiar, it’s time to talk.
- You have a lot you think qualifies but you’re not sure. Lot size, setbacks, and utility access determine what you can build, and guessing wrong wastes months. We assess the lot and confirm the rules with the city before design starts, so you’re not building on a bad assumption.
- You’ve started design without a permit plan. A plan that looks great but won’t pass review is money spent twice. We bring permit work in-house so the design is built around what the city will approve from the start.
- You want rental income and the numbers don’t add up yet. The unit type and size drive both the build cost and the income it can generate. We help you match the delivery method to your budget so the project pays for itself the way you expect.
- You need space for family and the house can’t stretch. Multigenerational living works better with a separate entrance and its own kitchen and bath. A detached unit or a junior ADU can give you that without a full remodel.
- You’ve talked to general contractors who treat ADUs as a side job. ADU work has its own rules, its own permit path, and its own design constraints. A specialist sees the problems before they become change orders.
Our ADU Builders Process – Step by Step
From blueprint to building permit to move-in day, every step sits with one team, which is what keeps ADU projects from stalling between trades.
- 1
Lot and feasibility review. We look at your lot, the existing house, utility access, and how the unit would sit on the property. Then we confirm the rules that apply to your lot with the city’s planning or building department, so the design is grounded in what’s actually allowed.
- 2
Design and path selection. We help you choose your path, prefab or fully custom, based on lot, budget, and timeline. Design and drawings are produced in-house, and we show you a written, line-item estimate before anything is finalized.
- 3
Permit acquisition. Permits handled, no surprises. We prepare and submit the permit package, respond to review comments, and keep the project moving through the city’s process. All the rules about setbacks, height, and siting get confirmed here for your specific lot.
- 4
Site prep and construction. Foundation, utilities, and site work come first, then the build or the install depending on your path. We coordinate the trades and inspections under one schedule so the unit goes up without the gaps that stretch a project out.
- 5
Final inspection and handover. We walk the finished unit with you, confirm the inspections have passed, and turn over the space ready to use. The schedule is set in the written estimate, so you know what to expect at each stage.
How Much Does ADU Builders Cost in Bellevue?

What you pay depends mostly on which unit type you choose and how much site work your lot needs. Here are the typical estimated ranges for Bellevue:
| Project Type | Typical Estimated Range |
|---|---|
| New Detached ADU | $180,000 – $350,000 |
| Garage Conversion ADU | $80,000 – $180,000 |
| Junior ADU & Interior Conversion | $40,000 – $90,000 |
| ADU Design & Permitting | $6,000 – $25,000 |
| ADU Site Prep & Utilities | $15,000 – $50,000 |
| Home Addition | $45,000 – $130,000 |
Site prep and utilities are where Bellevue lots vary the most. A flat, easy-to-reach site costs less to prepare than one that needs extra grading or long utility runs, and that difference shows up in the $15,000 – $50,000 range. Design and permitting also ranges widely because the amount of drawing and review work depends on the unit and the lot.
To avoid overpaying, get a written, line-item estimate before work starts and make sure the price is fixed with no change orders. Our free estimate breaks out design, permits, site prep, and construction as separate lines so you can see exactly where the money goes. The written estimate sets the final price.
ADU Builders Near Bellevue – Our Service Area
We work with homeowners across Bellevue and the surrounding Eastside, including Medina, Clyde Hill, Hunts Point, Mercer Island, Sammamish, Redmond, Newcastle, Kirkland, Renton, Issaquah, and Seattle. Every one of those cities runs its own ADU rules, and we confirm them with the local planning or building department before plans are final. If you’re comparing options, our ADU builders page explains how the process differs from one city to the next. We also serve homeowners looking at ADU builders in Medina and ADU builders in Clyde Hill, and you can start from our ADU Builder Bellevue home base to see the full range of projects we take on.
Serving Bellevue, WA – Our Local Coverage Area
We serve Bellevue and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked Questions – ADU Builders in Bellevue

An ADU builder is a specialist who designs, permits, and builds accessory dwelling units, which are separate or attached living spaces on a residential lot. We handle the full lifecycle in-house, from design to construction, so you’re not coordinating between a designer, a permit expeditor, and a builder who each blame the other. Rental rules depend on the city and are checked with the city before you plan around them.
The schedule depends on the unit type, the lot, and the permit process for your property, and it’s set out in your written estimate. A garage conversion or junior ADU moves faster than a ground-up detached unit because there’s less site work and a simpler permit path. We confirm the timeline with you before any work begins so you’re not guessing. Call (425) 699-8731 for a free estimate.
A new detached ADU in Bellevue typically runs an estimated $180,000 – $350,000, while a garage conversion runs an estimated $80,000 – $180,000 and a junior ADU runs an estimated $40,000 – $90,000. Design and permitting adds an estimated $6,000 – $25,000, and site prep and utilities adds an estimated $15,000 – $50,000 depending on your lot. The written estimate sets the final price. Call (425) 699-8731 for an exact quote – estimates are free.
Yes, we work with Abodu and Cover, along with Dvele, and we can help you compare a prefab unit against a custom build. We’re not a dealer and we don’t claim exclusivity with any brand, so our recommendation is about what fits your lot and budget, not what we’re trying to sell. If a prefab product is the wrong fit, we’ll say so and walk you through the custom path instead.
We answer 24/7, and fast dispatch runs from 7am to 7pm, Sunday through Friday. We’re closed Saturdays. ADU construction is planned work rather than emergency work, so the first step is a feasibility review and a written estimate rather than a same-day repair visit. Call (425) 699-8731 to get that process started.
We don’t publish a standard warranty number, so the coverage for your project is spelled out in your written estimate and agreement before work starts. That way you know what’s covered rather than relying on a general claim. Our technicians have up to 14 years of experience, and the workmanship is documented at each stage. Ask us for the details when you get your estimate.
Gather your property details, including the lot size and any existing utility connections, and think about what you want the unit to do: rental income, family space, or long-term value. The rest, including the siting rules, setbacks, and permit path, we confirm with the city’s planning or building department before plans are final. Call (425) 699-8731 and we’ll walk you through the feasibility review.
Schedule Your ADU Builders Service in Bellevue Today
Your property can work harder for you, and the fastest way to find out what’s possible on your lot is a free estimate. Call (425) 699-8731 to schedule yours. We answer 24/7, with fast dispatch from 7am to 7pm, Sunday through Friday. You’ll get a written, line-item quote with permits handled and no change orders, with zero obligation to move forward.
Written by the team at ADU Builder Bellevue.












