Get your free estimateHow Much Does ADU Cost in Kenmore?
A new detached ADU in Kenmore typically runs $180,000 to $350,000 for a full design-to-move-in project, while a garage conversion ADU usually falls between $80,000 and $180,000. Smaller paths cost less: a Junior ADU or interior conversion runs $40,000 to $90,000. Those ranges are typical estimates for the Kenmore market in 2026, and the written estimate sets your final price.
The spread inside each range is wide because an ADU is one part building project and one part site project. Kenmore’s older lots, its slopes and its mix of shoreline-edge and wooded parcels all move the number before a single wall goes up. Down the road, the market has its own rhythm too – the same forces that shape our work as an ADU builder in Bellevue show up here on a smaller scale, with tighter lots and more attention to how a new structure sits on the land.

Key Takeaways
- Detached ADUs in Kenmore typically estimate at $180,000 – $350,000; garage conversions at $80,000 – $180,000.
- Design and permitting alone runs $6,000 – $25,000, and site prep and utilities add $15,000 – $50,000.
- Prefab brands like Abodu, Cover and Dvele can lower the build side of the budget, but only when your lot suits a factory-built footprint.
- The written estimate is the real number. Free estimates mean you can compare paths before committing.
ADU Cost Breakdown (2026)
Here’s how the money breaks down across project types. Treat each line as a typical estimated range, not a quote.
| Project type | Typical estimated range |
|---|---|
| New detached ADU | $180,000 – $350,000 |
| Garage conversion ADU | $80,000 – $180,000 |
| Junior ADU & interior conversion | $40,000 – $90,000 |
| ADU design & permitting | $6,000 – $25,000 |
| ADU site prep & utilities | $15,000 – $50,000 |
| Home addition | $45,000 – $130,000 |
| Kitchen remodel | $14,000 – $45,000 |
| Bathroom remodel | $9,000 – $28,000 |
The detached ADU line is the widest because it bundles everything: foundation, framing, roof, mechanical, electrical, plumbing, finishes and the permit work that ties it together. A garage conversion reuses an existing shell, so you’re paying for insulation, a new slab edge, windows, a kitchenette and an upgraded panel rather than a whole new structure. The JADU and interior conversion range covers carving living space out of the existing house, which keeps construction smaller but still brings design and permit costs.
Site prep is the line homeowners underestimate most. Hooking a new structure to power, water and sewer can mean trenching across a yard, upsizing a panel, or adding a dedicated line from the main. On a flat lot with room, it stays near the low end. On a sloped or heavily treed Kenmore lot, it climbs.
What pushes cost up: difficult grading, long utility runs, tree removal and root protection, premium finish selections, and structural work to tie a new addition into an existing roofline. What pulls it down: choosing a JADU or interior conversion, keeping the footprint modest, and sticking with a prefab unit whose price is set before construction starts.

What Affects ADU Pricing in Kenmore
Kenmore sits at the north end of Lake Washington, and the shape of its lots and the age of its housing stock influence the estimate as much as the design.
- Lot slope and grading. Many Kenmore properties sit on a grade rather than a flat pad. A sloped lot usually means retaining walls, stepped foundations or a longer driveway, and each of those adds site work.
- Setbacks and lot coverage. The exact rules depend on your zone and your lot, so we confirm setback, height and coverage limits with the city’s planning or building department before plans are final. A lot with room to spare can fit a larger unit; a tight one may point toward a garage conversion or JADU instead.
- Utility distance from the main lines. The farther a new structure sits from the water, sewer and electrical connections, the more trenching and trench restoration the project needs. This single factor can move a project up the site prep range quickly.
- Existing garage condition. A conversion is only cheaper when the slab, walls and roof framing are sound enough to build on. A failing slab or a roof that needs replacing mid-project changes the math.
- Mature trees and drainage. Kenmore yards tend to be heavily planted. Root protection, tree removal and stormwater handling can add cost that a bare lot would never see.
- Prefab vs. site-built. A factory-built unit from Abodu, Cover or Dvele often locks in the construction price early, while a custom site-built ADU lets you design to the lot. Neither is automatically cheaper; the right answer depends on your property.
Because those rules vary from parcel to parcel, we don’t guess. We check them against the city before a design is locked, so you aren’t paying for drawings that don’t fit your lot.
Which ADU Path Fits Your Budget?
The most useful way to think about the cost is to match the project type to your goals and your lot. Each path has its own price band and its own constraints.
New detached ADU: $180,000 – $350,000
A standalone unit is the most flexible option. It gives you full privacy from the main house, a real yard, and the most options for rental income or multigenerational living. It’s also the priciest path because every system is new. If your lot has the space and your budget has the room, it’s the one that adds the most long-term value to the property.
Garage conversion ADU: $80,000 – $180,000
If you already have a sound detached garage, converting it is often the fastest route to livable space. You keep the existing footprint, which can ease lot coverage questions, and you’re building inside a shell instead of from the ground up. The catch is the condition of that shell and whether the existing electrical service can carry a full kitchen and bath.
Junior ADU and interior conversion: $40,000 – $90,000
A JADU carves a small, self-contained living space out of the existing house, usually with its own entrance. It’s the lowest-cost route and can work well for a family member or a modest rental. Interior conversions in this same range can repurpose an unused room or basement area.
Home addition: $45,000 – $130,000
Sometimes the goal is simply more room for the household rather than a separate unit. A home addition can add a primary suite or expand living space, and the design and permit work follows the same path we use on every ADU project.
Design and permitting, at $6,000 – $25,000, is a separate line that applies to whichever path you choose. We handle design, permit acquisition and construction in-house, so that work runs on one schedule instead of being handed between firms.
Prefab or Custom: How the Delivery Method Changes the Price
Prefab units from Abodu, Cover and Dvele carry a set price for the building itself, which takes some of the construction uncertainty out of the budget. The catch is that a factory footprint has to suit your lot, your setbacks and your utility connections. A custom site-built ADU is designed around your property instead, which can be the better fit on a sloped or irregular Kenmore lot but brings more variables into the estimate.
We work with all three prefab brands alongside fully custom builds, so we can put both paths side by side before you commit. That comparison is worth doing early, because swapping delivery methods partway through is the kind of change that erodes a budget. Whether you’re comparing options here or weighing the same tradeoffs with an ADU cost in Bellevue, the logic holds: match the method to the lot first, then set the budget.
How to Save on an ADU in Kenmore
There’s no way around the biggest costs (foundation, roof, mechanical), but the choices around them move the final number. A few practical moves:
- Pick the right path first. A JADU or conversion in the $40,000 – $90,000 range can meet your goals for far less than a detached build. Decide what the space needs to do before you fall in love with a design.
- Keep the unit close to existing utilities. Shorter runs mean less trenching, which is often the quiet budget killer on a Kenmore lot.
- Compare prefab and custom honestly. A prefab unit can cap construction costs, but only when it fits the lot. Ask for the comparison before you sign anything.
- Handle design and permits as one package. Coordinating them in-house avoids the gaps and rework that push projects over budget.
- Get a written estimate before work begins. Free estimates mean you can compare paths without paying for the privilege. Call (425) 699-8731.
How We Approach an ADU Project
We build one thing, and we build it right. Every project, from design through construction, is managed by one team that works only on ADUs, garage conversions, Junior ADUs, home additions and the design and permit work that gets them approved. Our technicians have up to 14 years of experience, and the full project runs from blueprint to building permit to move-in day.
That single-specialty focus matters most during permitting. The approval process is where most ADU projects stall, and we treat permit navigation as a core service rather than an afterthought. We confirm lot-specific rules with the city’s planning or building department before plans are final, so the drawings you pay for are the drawings the city sees. If you’re also considering options across the wider market, the process is similar whether you’re looking at an ADU builder in Seattle or closer to home here in Kenmore.
FAQs – ADU Cost in Kenmore
How much does an ADU cost in Kenmore in 2026?
A new detached ADU in Kenmore typically estimates at $180,000 to $350,000, all-in. Garage conversions run $80,000 to $180,000, and Junior ADUs or interior conversions run $40,000 to $90,000. The written estimate sets the final price. Call (425) 699-8731 for a free estimate.
Is it cheaper to convert a garage or build a new ADU?
A garage conversion usually costs less, estimating at $80,000 to $180,000 versus $180,000 to $350,000 for a detached unit, because you’re reusing the existing shell. The savings depend on the condition of the slab, walls and roof. If the garage is sound, conversion is typically the smaller investment. Call (425) 699-8731 to talk through which fits your property.
How much does ADU design and permitting cost in Kenmore?
ADU design and permitting typically estimates at $6,000 to $25,000, depending on the complexity of the design and the lot. Exact setback and height rules depend on your zone and parcel, so we confirm them with the city before plans are final. Call (425) 699-8731 for a free estimate that includes design and permit costs.
Can I do an ADU on a sloped or heavily treed Kenmore lot?
Often yes, though it usually adds site cost. Site prep and utilities typically run $15,000 to $50,000, and a sloped or treed lot tends toward the higher end because of grading, retaining walls and root protection. A garage conversion or JADU can sometimes sidestep the worst of it. Call (425) 699-8731 to find out what your lot supports.
What’s the lowest-cost ADU option in Kenmore?
A Junior ADU or interior conversion is typically the lowest-cost path, estimating at $40,000 to $90,000. It reuses space inside the existing house rather than building new. It won’t suit every household’s privacy needs, but it’s a real option for multigenerational living or a modest rental. Call (425) 699-8731 to compare it against a full detached build.
Get a Free ADU Estimate in Kenmore
Your lot has a number, and the fastest way to find it is a conversation. We’ll walk through whether a detached unit, a garage conversion or a JADU makes the most sense, compare prefab and custom paths side by side, and hand you a written estimate that sets the final price. From blueprint to building permit to move-in day, one team handles design, permits and construction so nothing gets dropped between the cracks.
Call (425) 699-8731 for a free estimate. We answer 24/7, with fast dispatch from 7am to 7pm, Sunday through Friday. Let’s make your property work harder for you.
Pricing reflects the Kenmore market as of 2026. ADU Builder Bellevue offers free estimates – call (425) 699-8731.
Written by the team at ADU Builder Bellevue.
What Our Customers Say
"He gave us a realistic rental number for the finished unit rather than the optimistic one, and it's renting for about what he said."
- Jeff Barrett"The kitchenette layout he suggested made better use of the space than the one on our original sketch."
- Steven Park"He was honest that our lot had a slope problem that would add real cost, before we signed anything."
- Adriana Mendoza